01Receive PMC Schedule
LaneI Emulsification ProcessFormula weighing and automated process execution.
  1. 1 Approved emulsification plan & process-sheet releasePlan & SOP release
    What happens

    The approved plan or SOP is released for this production lane.

    What is checked

    The approved scope and current release status are confirmed before work starts.

    What is recorded

    The applicable plan or SOP release is retained with the lane documentation.

  2. 2 Warehouse material preparation & scan-outMaterial scan-out
    What happens

    Materials are prepared and their movement or identity is scanned for the assigned work.

    What is checked

    Material identity and the required scan confirmation are reviewed before use.

    What is recorded

    The material preparation and scan activity is retained in the production record.

  3. 3 Pre-production training & line preparationLine readiness
    What happens

    The team completes pre-production preparation for the assigned line or operation.

    What is checked

    Personnel and line readiness are confirmed before the next step proceeds.

    What is recorded

    The pre-production preparation confirmation is retained with the lane record.

  4. 4 Formula release to weighing system
    What happens

    The approved plan or SOP is released for this production lane.

    What is checked

    The approved scope and current release status are confirmed before work starts.

    What is recorded

    The applicable plan or SOP release is retained with the lane documentation.

  5. 5 Raw-material scan review
    What happens

    Materials are prepared and their movement or identity is scanned for the assigned work.

    What is checked

    Material identity and the required scan confirmation are reviewed before use.

    What is recorded

    The material preparation and scan activity is retained in the production record.

  6. 6 Weighing identification
    What happens

    The formula or material quantity is identified and prepared for the required process step.

    What is checked

    The formula, material identity and weighing identification are reviewed against the released process.

    What is recorded

    The formula and weighing identification is retained in the batch documentation.

  7. 7 Vessel & process selection
    What happens

    The relevant vessel, process route or material feed is selected for execution.

    What is checked

    The selected route and material-to-process match are confirmed before execution.

    What is recorded

    The process selection or feed confirmation is retained with the batch record.

  8. 8 Scan-to-feed
    What happens

    The relevant vessel, process route or material feed is selected for execution.

    What is checked

    The selected route and material-to-process match are confirmed before execution.

    What is recorded

    The process selection or feed confirmation is retained with the batch record.

  9. 9 Automated process execution
    What happens

    Automated process execution is carried out as the defined operation in this production lane.

    What is checked

    The released process requirement for this operation is reviewed before the lane proceeds.

    What is recorded

    Completion of this operation is retained in the applicable production or batch record.

  10. 10 In-process inspection
    What happens

    The stated production checkpoint is inspected or formally confirmed.

    What is checked

    The defined condition or acceptance confirmation is reviewed before the route continues.

    What is recorded

    The inspection or confirmation result is retained in the applicable production documentation.

  11. 11 Discharge, weighing & label identification
    What happens

    The formula or material quantity is identified and prepared for the required process step.

    What is checked

    The formula, material identity and weighing identification are reviewed against the released process.

    What is recorded

    The formula and weighing identification is retained in the batch documentation.

  12. 12 Hold for inspection
    What happens

    The stated production checkpoint is inspected or formally confirmed.

    What is checked

    The defined condition or acceptance confirmation is reviewed before the route continues.

    What is recorded

    The inspection or confirmation result is retained in the applicable production documentation.

  13. 13 Batch-record filing
    What happens

    The completed lane documentation is filed after the operational sequence is complete.

    What is checked

    The required record set is reviewed for completion before filing.

    What is recorded

    The completed batch or return documentation is retained for review.

Control & evidence

Approved plan and process sheet; warehouse scan-out; formula/weighing identification; in-process inspection; discharge and batch records.

LaneII Packaging Material Pre-processingPackaging material preparation, pre-processing and location control.
  1. 1 Approved pre-processing plan & SOP releasePlan & SOP release
    What happens

    The approved plan or SOP is released for this production lane.

    What is checked

    The approved scope and current release status are confirmed before work starts.

    What is recorded

    The applicable plan or SOP release is retained with the lane documentation.

  2. 2 Warehouse material preparation & scan-outMaterial scan-out
    What happens

    Materials are prepared and their movement or identity is scanned for the assigned work.

    What is checked

    Material identity and the required scan confirmation are reviewed before use.

    What is recorded

    The material preparation and scan activity is retained in the production record.

  3. 3 Pre-production training & line preparationLine readiness
    What happens

    The team completes pre-production preparation for the assigned line or operation.

    What is checked

    Personnel and line readiness are confirmed before the next step proceeds.

    What is recorded

    The pre-production preparation confirmation is retained with the lane record.

  4. 4 Unpack, match & pre-process
    What happens

    Unpack, match & pre-process is carried out as the defined operation in this production lane.

    What is checked

    The released process requirement for this operation is reviewed before the lane proceeds.

    What is recorded

    Completion of this operation is retained in the applicable production or batch record.

  5. 5 In-process inspection
    What happens

    The stated production checkpoint is inspected or formally confirmed.

    What is checked

    The defined condition or acceptance confirmation is reviewed before the route continues.

    What is recorded

    The inspection or confirmation result is retained in the applicable production documentation.

  6. 6 Label identification
    What happens

    The material, work-in-process or finished item receives its required identification label.

    What is checked

    The label and the identity it represents are confirmed before handover or storage.

    What is recorded

    The label-identification action is retained with the associated lane record.

  7. 7 Assigned-location storage
    What happens

    The item is handed over to its defined inbound, storage or return-to-stock destination.

    What is checked

    The destination, status and handover confirmation are reviewed before the movement closes.

    What is recorded

    The inbound, storage or return handover is retained in the relevant record.

  8. 8 Batch-record filing
    What happens

    The completed lane documentation is filed after the operational sequence is complete.

    What is checked

    The required record set is reviewed for completion before filing.

    What is recorded

    The completed batch or return documentation is retained for review.

Control & evidence

Approved pre-processing plan/SOP; material scan-out; process inspection; labels, assigned-location storage and batch records.

LaneIII Filling & Packaging ProcessFirst-piece confirmation through controlled filling and finished-goods inbound.
  1. 1 Approved filling/packaging plan & SOP releasePlan & SOP release
    What happens

    The approved plan or SOP is released for this production lane.

    What is checked

    The approved scope and current release status are confirmed before work starts.

    What is recorded

    The applicable plan or SOP release is retained with the lane documentation.

  2. 2 Warehouse material preparation & scan-outMaterial scan-out
    What happens

    Materials are prepared and their movement or identity is scanned for the assigned work.

    What is checked

    Material identity and the required scan confirmation are reviewed before use.

    What is recorded

    The material preparation and scan activity is retained in the production record.

  3. 3 Pre-production training & line preparationLine readiness
    What happens

    The team completes pre-production preparation for the assigned line or operation.

    What is checked

    Personnel and line readiness are confirmed before the next step proceeds.

    What is recorded

    The pre-production preparation confirmation is retained with the lane record.

  4. 4 First-piece confirmation
    What happens

    The stated production checkpoint is inspected or formally confirmed.

    What is checked

    The defined condition or acceptance confirmation is reviewed before the route continues.

    What is recorded

    The inspection or confirmation result is retained in the applicable production documentation.

  5. 5 Filling & packaging production
    What happens

    Filling & packaging production is carried out as the defined operation in this production lane.

    What is checked

    The released process requirement for this operation is reviewed before the lane proceeds.

    What is recorded

    Completion of this operation is retained in the applicable production or batch record.

  6. 6 In-process inspection
    What happens

    The stated production checkpoint is inspected or formally confirmed.

    What is checked

    The defined condition or acceptance confirmation is reviewed before the route continues.

    What is recorded

    The inspection or confirmation result is retained in the applicable production documentation.

  7. 7 Filling-line inspection
    What happens

    The stated production checkpoint is inspected or formally confirmed.

    What is checked

    The defined condition or acceptance confirmation is reviewed before the route continues.

    What is recorded

    The inspection or confirmation result is retained in the applicable production documentation.

  8. 8 Label identification
    What happens

    The material, work-in-process or finished item receives its required identification label.

    What is checked

    The label and the identity it represents are confirmed before handover or storage.

    What is recorded

    The label-identification action is retained with the associated lane record.

  9. 9 Finished-goods inbound
    What happens

    The item is handed over to its defined inbound, storage or return-to-stock destination.

    What is checked

    The destination, status and handover confirmation are reviewed before the movement closes.

    What is recorded

    The inbound, storage or return handover is retained in the relevant record.

  10. 10 Batch-record filing
    What happens

    The completed lane documentation is filed after the operational sequence is complete.

    What is checked

    The required record set is reviewed for completion before filing.

    What is recorded

    The completed batch or return documentation is retained for review.

Control & evidence

Approved plan/SOP; material scan-out; first-piece confirmation; in-process and filling-line inspections; labels, inbound and batch records.

LaneIV Assembly ProcessAssembly work controlled from first-piece confirmation to finished-goods inbound.
  1. 1 Approved assembly plan & SOP releasePlan & SOP release
    What happens

    The approved plan or SOP is released for this production lane.

    What is checked

    The approved scope and current release status are confirmed before work starts.

    What is recorded

    The applicable plan or SOP release is retained with the lane documentation.

  2. 2 Warehouse material preparation & scan-outMaterial scan-out
    What happens

    Materials are prepared and their movement or identity is scanned for the assigned work.

    What is checked

    Material identity and the required scan confirmation are reviewed before use.

    What is recorded

    The material preparation and scan activity is retained in the production record.

  3. 3 Pre-production training & line preparationLine readiness
    What happens

    The team completes pre-production preparation for the assigned line or operation.

    What is checked

    Personnel and line readiness are confirmed before the next step proceeds.

    What is recorded

    The pre-production preparation confirmation is retained with the lane record.

  4. 4 First-piece confirmation
    What happens

    The stated production checkpoint is inspected or formally confirmed.

    What is checked

    The defined condition or acceptance confirmation is reviewed before the route continues.

    What is recorded

    The inspection or confirmation result is retained in the applicable production documentation.

  5. 5 Assembly production
    What happens

    Assembly production is carried out as the defined operation in this production lane.

    What is checked

    The released process requirement for this operation is reviewed before the lane proceeds.

    What is recorded

    Completion of this operation is retained in the applicable production or batch record.

  6. 6 In-process inspection
    What happens

    The stated production checkpoint is inspected or formally confirmed.

    What is checked

    The defined condition or acceptance confirmation is reviewed before the route continues.

    What is recorded

    The inspection or confirmation result is retained in the applicable production documentation.

  7. 7 Label identification
    What happens

    The material, work-in-process or finished item receives its required identification label.

    What is checked

    The label and the identity it represents are confirmed before handover or storage.

    What is recorded

    The label-identification action is retained with the associated lane record.

  8. 8 Finished-goods inbound
    What happens

    The item is handed over to its defined inbound, storage or return-to-stock destination.

    What is checked

    The destination, status and handover confirmation are reviewed before the movement closes.

    What is recorded

    The inbound, storage or return handover is retained in the relevant record.

  9. 9 Batch-record filing
    What happens

    The completed lane documentation is filed after the operational sequence is complete.

    What is checked

    The required record set is reviewed for completion before filing.

    What is recorded

    The completed batch or return documentation is retained for review.

Control & evidence

Approved plan/SOP; material scan-out; first-piece confirmation; in-process inspection; labels, finished-goods inbound and batch records.

LaneV Material Return ProcessA separate return route keeps unused materials identified and documented.
  1. 1 Classification, Counting or WeighingPlan & SOP release
    What happens

    The formula or material quantity is identified and prepared for the required process step.

    What is checked

    The formula, material identity and weighing identification are reviewed against the released process.

    What is recorded

    The formula and weighing identification is retained in the batch documentation.

  2. 2 Label IdentificationMaterial scan-out
    What happens

    The material, work-in-process or finished item receives its required identification label.

    What is checked

    The label and the identity it represents are confirmed before handover or storage.

    What is recorded

    The label-identification action is retained with the associated lane record.

  3. 3 Inspection ConfirmationLine readiness
    What happens

    The stated production checkpoint is inspected or formally confirmed.

    What is checked

    The defined condition or acceptance confirmation is reviewed before the route continues.

    What is recorded

    The inspection or confirmation result is retained in the applicable production documentation.

  4. 4 Handover and Return to Stock
    What happens

    The item is handed over to its defined inbound, storage or return-to-stock destination.

    What is checked

    The destination, status and handover confirmation are reviewed before the movement closes.

    What is recorded

    The inbound, storage or return handover is retained in the relevant record.

  5. 5 Document Filing
    What happens

    The completed lane documentation is filed after the operational sequence is complete.

    What is checked

    The required record set is reviewed for completion before filing.

    What is recorded

    The completed batch or return documentation is retained for review.

Control & evidence

Return classification/counting or weighing record; label identification; inspection confirmation; return-to-stock handover and filed documents.

Questions about your process? Talk to our team.

Choose a specialist to discuss formula, packaging format, production controls or testing requirements in more detail.